East Africa

66/33KV Substation Project

East Africa Completed Power Infrastructure

Project Overview

East African utilities are enhancing their power infrastructure to meet growing demand and improve grid reliability. The Utility has initiated projects focusing on the reinforcement of 33KV and 66KV systems, including substation upgrades and the Last Mile Connectivity.

Infrastructure Enhancement

Technocrafts Electric has been actively engaged with one of the local EPC agencies and executed a contract to develop a 66/33KV substation in the region.

Our Contribution

Under this scheme Technocrafts Electric undertook the complete engineering support to its local EPC partner.

  • Design and Engineering of 66kV/33kV Switchyard and associated equipment
  • SITC of 33kV Air Insulated switchgear
  • Associated Outdoor Switchyard Equipment like CT/PT/Isolators/CBs
  • Supply of Switchgear and Control Room Equipment
  • Design and Integration of SCADA System